Subang SkyPark Terminal Extension Project

Printer-friendly versionSend by emailPDF version

The Subang Skypark Terminal Extension Project aims to provide a rail-based public transport to connect commuters to the Subang Airport, the SkyPark Terminal.

The new line will start from the Subang Jaya station, spanning 8.157km long and will end at the Subang SkyPark Terminal station which is located in front of Terminal 3, of the airport.

The construction of the double track adopts the existing rail system operated by KTM Komuter for Greater Kuala Lumpur/Klang Valley including 25kV electrification system, signalling and communication system as well as direct control of the train from the Train Control Centre (TCC) in KL Sentral which is the integrated hub of the Kuala Lumpur city. 